January in seattle has broken the records for warm temps. Its been great for working on the boat.
Check out Cliff Mass's weather blog.
-The deck has been sanded to 320 grit.
-Most of the small flaws have been patched.
-The edges on the transom and bow fillet cap have been eased.
-epoxy stains have been removed from the interior side of the gunwale.
-Some filleting details for the hatches have been completed.
-Lines laid down for the taping for the anti-skid compound.
My Dad came up and dropped off all 4 oars! wow.
Also, the foot brace, wine rack :), and put on the transom gunwale cap as well as faired most of the bow and transom hatch deck.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment