skip to main
|
skip to sidebar
The Minutes of a Dory Build
Neu Woodworks meets the whitewater dory
Showing posts with label
new shop
.
Show all posts
Showing posts with label
new shop
.
Show all posts
10/26/09
Day 13: The New Shop
Today we moved into our shop space for the deck build. We signed the lease, got the run-down on the space, moved the boat in and set up for work tomorrow. The shop seems great and I can't wait to start turning this dory into a whitewater dory.
Older Posts
Home
Subscribe to:
Posts (Atom)
Pages
Home
Contact
About Me
kneu
Seattle, WA, United States
View my complete profile
Blog Archive
▼
2011
(6)
▼
November
(4)
Driftwood Drift Boat Timelapse
Driftwood Dory Construction: Hull and Deck Assembly
Driftwood Dory Construction: Driftwood and frames
Lower Salmon River MegaBachelorette
►
February
(1)
►
January
(1)
►
2010
(59)
►
November
(1)
►
October
(1)
►
July
(2)
►
June
(2)
►
May
(2)
►
March
(23)
►
February
(18)
►
January
(10)
►
2009
(54)
►
December
(17)
►
November
(9)
►
October
(24)
►
August
(1)
►
July
(1)
►
June
(2)
Followers
Favorite Links
My Commercial River Trips
Wooden Boat People
Desolation Dory Blog
The Happy Trout Chronicles
Pimp my dory
Grand Canyon River Guides
Jeri Ledbetter River Trips
Idaho Rivers United
Save Our Wild Salmon Blog
Meandering Fork Blog
Sundog Expeditions
Salmon River Shuttle